Franklin Central High School Addition and Renovations - Phase 3A.1
Choose Plan Sheet:
«
»
1060 N. Capitol Ave. - Suite 3-101 Indianapolis, Indiana 46204
1 - TOPOGRAPHIC SURVEY
2 - TOPOGRAPHIC SURVEY
3 - TOPOGRAPHIC SURVEY
4 - TOPOGRAPHIC SURVEY
C300 - PROJECT INFORMATION
C301 - OVERALL SITE PLAN
C310 - STORMWATER POLLUTION PREVENTION PLAN
C311 - STORMWATER POLLUTION PREVENTION NOTES
C312 - STORMWATER POLLUTION PREVENTION DETAILS
C320 - SITE DEMOLITION PLAN
C330 - SITE GRADING PLAN
C340 - SITE UTILITY PLAN
C341 - SITE UTILITY DETAILS
C342 - CITIZENS ENERGY DETAILS
C350 - SITE IMPROVEMENT PLAN
C351 - SITE IMPROVEMENT DETAILS
A001 - FIRST FLOOR LIFE SAFETY PLAN = SOUTH & DETAILS
A002 - FIRST FLOOR LIFE SAFETY PLAN - NORTH & WALL TYPES
A003 - SECOND FLOOR LIFE SAFETY PLAN - SOUTH
A004 - SECOND FLOOR LIFE SAFETY PLAN - NORTH
AD101 - DEMOLITION PLAN
A101 - OVERALL FIRST FLOOR PLAN - UNIT V
A101A - FIRST FLOOR PLAN - UNIT V WEST
A101B - FIRST FLOOR PLAN - UNIT V EAST
A101C - FIRST FLOOR PLAN - UNIT V NORTH & FIELD STRIPING GRAPHICS PLAN
A102 - PARTIAL EXISTING SECOND FLOOR & NEW BALCONY PLAN - UNIT V & DETAILS
A103A - REFLECTED CEILING PLAN - UNIT V WEST
A103B - REFLECTED CEILING PLAN - UNIT V EAST
A103C - REFLECTED CEILING PLAN - UNIT V NORTH & DETAILS
A201 - ROOF PLAN & DETAILS
A301 - BUILDING ELEVAITONS & BUILDING SECTIONS
A401 - BUILDING SECTIONS
A402 - WALL SECTIONS & DETAILS
A403 - WALL SECTIONS & DETAILS
A404 - WALL SECTIONS & DETAILS
A405 - WALL SECTIONS & DETAILS
A501 - INTERIOR ELEVATIONS & DETAILS
A601 - DOOR & ROOM FINISH SCHEDULES DOOR & FRAME TYPES AND DETAILS
S101 - GERNAL NOTES
S201 - PARTIAL FOUNDATION SECOND FLOOR & ROOF FRAMING PLAN - UNIT V
S202 - PARTIAL FOUNDATION PLAN - UNIT V
S301 - SECTIONS
S302 - SECTIONS
S401 - DETAILS
P001 - PLUMBING SYMBOLS AND ABBREVIATIONS
PFD1V.A - PLUMBING DEMO FOUNDATION PLAN - UNIT V (WEST)
FP1V - FIRE PROTECTION FIRST FLOOR PLAN - UNIT V
PF1V.A - PLUMBING FOUNDATION PLAN - UNIT V (WEST)
PP1V.A - PLUMBING FIRST FLOOR PLAN - UNIT V (WEST)
PP1V.B - PLUMBING FIRST FLOOR PLAN - UNIT V (EAST)
PP1V.C - PLUMBING FOUNDATION & FIRST FLOOR PLAN - UNIT V (NORTH)
PR1V.A - PLUMBING ROOF PLAN - UNIT V (WEST)
P601 - PLUMBING DETAIL AND SCHEDULES
M001 - MECHANICAL SYMBOLS AND ABBREVIATIONS
MD1H - MECHANICAL DEMOLITION HVAC PLAN - UNIT H
MD1H.1 - MECH. DEMOLITION HVAC PLAN - UNIT H (TEMP. CHILLER PIPING)
MH1V.A - MECHANICAL HVAC PLAN - UNIT V (WEST)
MH1V.B - MECHANICAL HVAC PLAN - UNIT V (EAST)
MH1V.C - MECHANICAL HVAC PLAN - UNIT V (NORTH)
MHR - PARTIAL MECHANICAL ROOF PLAN
MP1H - MECHANICAL PIPING PLAN - UNIT H
MP1K - MECHANICAL PIPING PLAN - UNIT K
MP1V.A - MECHANICAL PIPING PLAN - UNIT V (WEST)
MP1V.B - MECHANICAL PIPING PLAN - UNIT V (EAST)
MP1V.C - MECHANICAL PIPING PLAN - UNIT V (NORTH)
M501 - MECHANICAL DETAILS
M502 - MECHANICAL DETAILS
M503 - MECHANICAL DETAILS
M601 - MECHANICAL SCHEDULES
M602 - MECHANICAL SCHEDULES
M701 - TEMPERATURE CONTROLS
M702 - TEMPERATURE CONTROLS
M703 - TEMPERATURE CONTROLS
M704 - TEMPERATURE CONTROLS
E001 - ELECTRICAL SYMBOLS AND ABBREVIATIONS
EDS01 - ELECTRICAL SITE DEMOLITION PLAN
ED1H - ELECTRICAL DEMOLITION FIRST FLOOR PLAN - UNIT H
ED701 - DEMOLITION OVERALL ONE-LINE DIAGRAM
ED704 - DEMOLITION ONE-LINE DIAGRAM 1NSBH43
ES101 - ELECTRICAL SITE PLAN
EL1J - FIRST FLOOR LIGHTING PLAN - UNIT J
EL1V.A - FIRST FLOOR LIGHTING PLAN - UNIT V (WEST)
EL1V.B - FIRST FLOOR LIGHTING PLAN - UNIT V (EAST)
EL1V.C - FIRST FLOOR LIGHTING PLAN - UNIT V (NORTH)
EP1H - POWER FIRST FLOOR PLAN - UNIT H
EP1V.A - FIRST FLOOR POWER PLAN - UNIT V (WEST)
EP1V.B - FIRST FLOOR POWER PLAN - UNIT V (EAST)
EP1V.C - FIRST FLOOR POWER PLAN - UNIT V (NORTH)
EF1U.2 - FIRST FLOOR FIRE ALARM PLAN - UNIT U.2
EF1U.3 - FIRST FLOOR FIRE ALARM PLAN - UNIT U.3
EF1V.A - FIRST FLOOR FIRE ALARM PLAN - UNIT V (WEST)
EF1V.B - FIRST FLOOR FIRE ALARM PLAN - UNIT V (EAST)
EF1V.C - FIRST FLOOR FIRE ALARM PLAN - UNIT (NORTH)
E301 - SECTIONS
E401 - ENLARGED PLANS
E501 - GROUNDING DETAILS
E502 - LIGHTING DETAILS
E503 - GENERAL DETAILS
E504 - UTILITY DETAILS
E601 - LIGHTING SCHEDULES
E602 - EQUIPMENT SCHEDULES
E603 - PANELBOARD SCHEDULES
E701 - OVERALL ONE-LINE DIAGRAM
E704 - ONE-LINE DIAGRAM 1NSBH43
E706 - ONE-LINE DIAGRAM 1NSBV41
T001 - TECHNOLOGY SCOPE MATRIX
T101 - FIRST FLOOR OVERALL DISTRIBUTION PLAN
T101V.1 - FIRST FLOOR DISTRIBUTION PLAN - UNIT V WEST
T101V.2 - FIRST FLOOR DISTRIBUTION PLAN - UNIT V EAST
T201V.1 - FIRST FLOOR TELECOM PLAN - UNIT V WEST
T201V.2 - FIRST FLOOR TELECOM PLAN - UNIT V EAST
T202V.1 - SECOND FLOOR TELECOM PLAN - UNIT V WEST
T202V.2 - SECOND FLOOR TELECOM PLAN -
T211V.1 - FIRST FLOOR REFLECTED CEILING - UNIT V WEST
T211V.2 - FIRST FLOOR REFLECTED CEILING - UNIT V EAST
T300 - TELECOM SECURITY DIAGRAMS
T301 - ENLARGED TR LAYOUTS RACK
T302 - AV DIAGRAMS RACK ELEVATIONS
T303 - AV ELEVATIONS
T400 - TECHNOLOGY DETAILS
T401 - SECURITY DETAILS
T500 - TELECOM SECURITY SCHEDULES
Page:
Previous
Next
Use Ctrl + mouse scroll wheel over the document to zoom.