Smoky Row Elem Additions & Renovations
Choose Plan Sheet:
«
»
COVER - COVER SHEET
INDEX A ABBREVIATIONS AND INDEX
G0.1 - GENERAL NOTES
G0.2 - GENERAL NOTES
.1 - BOUNDARY RETRACEMENT SURVEY
.2 - BOUNDARY RETRACEMENT SURVEY
1 - TOPOGRAPHIC SURVEY
2 - TOPOGRAPHIC SURVEY
GD1.0 - OVERALL DEMOLITION PLAN
GD1.1 - DEMOLITION PLAN (SOUTH)
GD1.2 - DEMOLITION PLAN (NORTH)
GD1.3 - DEMOLITION PLAN (TEMPORARY CLASSROOM)
G1.0 - OVERALL SITE LAYOUT PLAN
G1.1 - SITE LAYOUT PLAN (SOUTH)
G1.2 - SITE LAYOUT PLAN (NORTH)
G1.3 - SITE LAYOUT PLAN (TEMPORARY CLASSROOM)
G1.4 - STRIPING & SIGNAGE PLAN
G2.1 - GRADING PLAN (SOUTH)
G2.2 - GRADING PLAN (NORTH)
G2.3 - ENLARGED GRADING PLAN (TEMPORARY CLASSROOMS)
G2.4 - ENLARGED GRADING PLAN (ADA RAMPS)
G2.5 - EMERGENCY FLOOD ROUTING PLAN
G3.1 - EROSION CONTROL PLAN PRE-CONSTRUCTION
G3.2 - EROSION CONTROL PLAN
G3.3 - EROSION CONTROL DETAILS
G3.4 - STORMWATER POLLUTION PREVENTION PLAN
G4.1 - SITE DETAILS
G4.2 - SITE DETAILS
G4.3 - SITE DETAILS
SU1.0 - OVERALL SITE UTILITY PLAN
SU1.1 - SITE UTILITY PLAN (SOUTH)
SU1.2 - SITE UTILITY PLAN (NORTH)
SU1.3 - SITE UTILITY PLAN (TEMPORARY CLASSROOMS)
SU1.4 - STORM SEWER PLAN AND PROFILES
SU2.1 - SITE UTILITY DETAILS
SU2.2 - SITE UTILITY DETAILS
L1.0 - OVERALL LANDSCAPE PLAN
L1.1 - LANDSCAPE PLAN (SOUTH)
L1.2 - LANDSCAPE PLAN (NORTH)
L1.3 - LANDSCAPE PLAN (TEMPORARY CLASSROOM)
L2.0 - LANDSCAPE DETAILS
CTE-GD1.0 - OVERALL SITE DEMOLITION PLAN - CTE
CTE-L1.0 - OVERALL PLAYGROUND SITE LAYOUT PLAN - CTE
CTE- L1.1 - ENLARGED NW PLAYGROUND SITE LAYOUT PLAN - CTE
CTE- L1.2 - ENLARGED EARLY LEARNING PLAYGROUND SITE LAYOUT PLAN-
CTE- L1.3 - ENLARGED SW PLAYGROUND SITE LAYOUT PLAN - CTE
CTE- L1.4 - ENLARGED KINDERGARTEN PLAYGROUND SITE LAYOUT PLAN-
CTE- L4.00 - SITE DETAILS
CTE- L4.01 - SITE DETAILS
SREL1.00 - OVERALL SITE PLAN
SREL1.10 - ENLARGED SITE PLAN PLAYGROUND A & C
SREL1.20 - ENLARGED SITE PLAN ELC PLAYGROUND
SREL1.30 - ENLARGED SITE PLAN PLAYGROUND B.
SREL1.40 - ENLARGED SITE PLAN KINDERGARTEN PLAYGROUND
SREL1.50 - SITE GRAPHICS PLAN PLAYGROUND A
SREL1.60 - SITE GRAPHICS PLAN PLAYGROUNDS A C
SREL1.70 - SITE GRAPHICS PLAN PLAYGROUND B
SREL1.80 - SITE GRAPHICS PLAN ELC PLAYGROUND
SREL4.00 - SITE DETAILS
SREL4.01 - SITE DETAILS
S0.01 - GENERAL NOTES
S1.01 - UNIT B - FOUNDATION PLAN
S1.02 - A - SLAB AND MASONRY PLAN
S1.03 - B - SLAB AND MASONRY PLAN
S1.04 - C - SLAB AND MASONRY PLAN
S1.05 - D - SLAB AND MASONRY PLAN
S2.01 - UNIT B - ROOF FRAMING PLANS
S3.01 - FOUNDATION DETAILS
S3.02 - FOUNDATION DETAILS
S3.03 - FOUNDATION AND SLAB DETAILS
S3.04 - SLAB DETAILS
S4.01 - MASONRY DETAILS
S4.02 - MASONRY DETAILS
S4.03 - MASONRY LINTELS
S4.04 - MASONRY WALL ELEVATIONS
S5.01 - FRAMING DETAILS
S5.02 - FRAMING DETAILS
S5.03 - FRAMING SECTIONS
S5.04 - FRAMING SECTIONS
S5.05 - FRAMING SECTIONS
S1.1 - MODULAR BUILDING FOUNDATION PLAN AND DETAILS
AD0.01 - UNIT A DEMOLITION PLAN
AD0.02 - UNIT B DEMOLITION PLAN
AD0.03 - UNIT C DEMOLITION PLAN
AD0.04 - UNIT D DEMOLITION PLAN
AD0.05 - MISC. DEMOLITION PLANS
A0.01 - FIRST FLOOR CODE PLAN
A0.02 - MEZZANINE LEVEL CODE PLAN
A1.01 - UNIT A - FIRST FLOOR ARCHITECTURAL PLAN
A1.02 - UNIT B - FIRST FLOOR ARCHITECTURAL PLAN
A1.03 - UNIT C - FIRST FLOOR ARCHITECTURAL PLAN
A1.04 - UNIT D - FIRST FLOOR ARCHITECTURAL PLAN
A1.05 - UPPER LEVEL FLOOR PLANS
A1.06 - WALL TYPES AND DETAILS
A1.07 - MOUNTING HEIGHTS, STALL LEGENDS
A1.08 - ENLARGED TOILET ROOM PLANS
A2.00 - OVERALL ROOF PLAN
A2.01 - ROOF PLAN
A2.02 - ROOF DETAILS
A3.01 - BUILDING ELEVATIONS
A3.02 - BUILDING ELEVATIONS
A3.03 - BUILDING ELEVATIONS
A4.01 - BUILDING SECTIONS
A5.01 - WALL SECTIONS
A5.02 - WALL SECTIONS
A5.03 - WALL SECTIONS
A5.04 - WALL SECTIONS
A5.05 - WALL SECTIONS
A5.06 - DETAILS
A5.07 - WALL SECTIONS
A5.08 - WALL SECTIONS
A5.09 - RAILING DETAILS
A5.10 - PLANTER PLAN AND SECTIONS
A6.01 - FRAME TYPES AND DETAILS
A6.02 - FRAME DETAILS
A6.03 - FRAME DETAILS DOOR TYPES
A6S.01 - DOOR AND FRAME SCHEDULE
A6S.02 - DOOR AND FRAME SCHEDULE
A7.01 - UNIT A - FIRST FLOOR EQUIPMENT PLAN
A7.02 - UNIT B - FIRST FLOOR EQUIPMENT PLAN
A7.03 - UNIT C - FIRST FLOOR EQUIPMENT PLAN
A7.04 - UNIT D - FIRST FLOOR EQUIPMENT PLAN
A7.05 - UPPER LEVEL EQUIPMENT PLANS
A7.06 - EQUIPMENT DETAILS
A7.07 - EQUIPMENT DETAILS
A7.08 - CASEWORK & EQUIPMENT ELEVATIONS
A7.09 - CASEWORK & EQUIPMENT ELEVATIONS
A7.10 - CASEWORK & EQUIPMENT ELEVATIONS
A7S.01 - EDUCATIONAL CASEWORK SCHEDULES
A8.01 - UNIT A - FIRST FLOOR FLOOR FINISH PLAN
A8.02 - UNIT B - FIRST FLOOR FLOOR FINISH PLAN
A8.03 - UNIT C - FIRST FLOOR FLOOR FINISH PLAN
A8.04 - UNIT D - FIRST FLOOR FLOOR FINISH PLAN
A8.05 - UPPER LEVEL FINISH PLANS
A8.06 - INTERIOR ELEVATIONS
A8.07 - INTERIOR ELEVATIONS
A8.08 - INTERIOR ELEVATIONS
A8.09 - INTERIOR ELEVATIONS
A8.10 - INTERIOR DETAILS
A8.11 - FLOORING DETAILS
A8S.01 - LIST OF FINISHES
A9.01 - UNIT A - REFLECTED CEILING PLAN
A9.02 - UNIT B - REFLECTED CEILING PLAN
A9.03 - UNIT C - REFLECTED CEILING PLAN
A9.04 - UNIT D - REFLECTED CEILING PLAN
A9.05 - UNIT C - UPPER LEVEL REFLECTED CEILING PLAN AND DETAILS
A9.06 - REFLECTED CEILING PLAN DETAILS
K1.00 - FOODSERVICE GENERAL NOTES & SHEET INDEX
K1.01 - FOODSERVICE LAYOUT OVERALL
K1.02 - FOODSERVICE LAYOUT
K1.03 - FOODSERVICE SPECIAL CONDITIONS LAYOUT
K1.04 - ROOF TOP LAYOUT
K2.00 - FOODSERVICE EQUIPMENT SCHEDULE
K3.00 - FOODSERVICE PLUMBING LAYOUT
K3.01 - FOODSERVICE ELECTRICAL LAYOUT
K4.00 - WALK-IN COOLER FREEZER DETAILS
K4.01 - WALK-IN COOLER FREEZER DETAILS
K4.02 - WALK-IN COOLER FREEZER DETAILS
K5.00 - EXHAUST HOOD SYSTEM DETAILS
K5.01 - EXHAUST HOOD SYSTEM DETAILS
K5.02 - EXHAUST HOOD SYSTEM DETAILS
K5.03 - EXHAUST HOOD SYSTEM DETAILS
K6.00 - FOODSERVICE DETAILS, ELEVATIONS & SECTIONS
K6.01 - FOODSERVICE DETAILS, ELEVATIONS & SECTIONS
COVER - COVER SHEET
INDEX B ABBREVIATIONS AND INDEX
PFP.01 - FIRST FLOOR FIRE PROTECTION PLAN
PFP.02 - MEZZANINE AND ENLARGED MECHANICAL ROOM FIRE PROTECTION PLANS
P1.01 - SYMBOLS & ABBREVIATIONS
PD.01 - UNIT A - FOUNDATION PLUMBING DEMOLITION PLAN
PD.02 - UNIT B - FOUNDATION PLUMBING DEMOLITION PLAN
PD.03 - UNIT C - FOUNDATION PLUMBING DEMOLITION PLAN
PD.04 - UNIT A - FIRST FLOOR PLUMBING DEMOLITION PLAN
PD.05 - UNIT B - FIRST FLOOR PLUMBING DEMOLITION PLAN
PD.06 - UNIT C - FIRST FLOOR PLUMBING DEMOLITION PLAN
PD.07 - UNIT D - FIRST FLOOR PLUMBING DEMOLITION PLAN
P2.01 - UNIT A - FOUNDATION PLUMBING PLAN
P2.02 - UNIT B - FOUNDATION PLUMBING PLAN
P2.03 - UNIT C - FOUNDATION PLUMBING PLAN
P2.04 - UNIT D - FOUNDATION PLUMBING PLAN
P2.05 - UNIT A - FIRST FLOOR PLUMBING PLAN
P2.06 - UNIT B - FIRST FLOOR PLUMBING PLAN
P2.07 - UNIT C - FIRST FLOOR PLUMBING PLAN
P2.08 - UNIT D - FIRST FLOOR PLUMBING PLAN
P3.01 - PLUMBING SCHEDULES AND DETAILS
P3.02 - PLUMBING ISOMETRICS
P3.03 - PLUMBING ISOMETRICS
P3.04 - PLUMBING ISOMETRICS
P4.01 - ENLARGED PLUMBING PLANS
P4.02 - ENLARGED PLUMBING PLANS
P4.03 - ENLARGED PLUMBING PLANS
M1.01 - SYMBOLS & ABBREVIATIONS
MD1.01 - 1ST FLR DEMOLITION PLAN - UNIT A
MD1.02 - 1ST FLR DEMOLITION PLAN - UNIT B
MD1.03 - 1ST FLR DEMOLITION PLAN - UNIT C
MD1.04 - 1ST FLR DEMOLITION PLAN - UNIT D
M2.01 - 1ST FLR VENTILATION PLAN - UNIT A
M2.02 - 1ST FLR VENTILATION PLAN - UNIT B
M2.03 - 1ST FLR VENTILATION PLAN - UNIT C
M2.04 - 1ST FLR VENTILATION PLAN - UNIT D
M3.01 - 1ST FLR PIPING PLAN - UNIT A
M3.02 - 1ST FLR PIPING PLAN - UNIT B
M3.03 - 1ST FLR PIPING PLAN - UNIT C
M3.04 - 1ST FLR PIPING PLAN - UNIT D
M4.01 - BOILER ROOM AND MECHANICAL MEZZANINE
M5.01 - MECHANICAL SCHEDULES
M5.02 - MECHANICAL SCHEDULES
M5.03 - MECHANICAL DETAILS
M5.04 - MECHANICAL DETAILS
M5.05 - HEATING WATER SCHEMATIC
M6.01 - 1ST FLR TEMPERATURE CONTROL PLAN - UNIT A & B
M6.02 - 1ST FLR TEMPERATURE CONTROL PLAN - UNIT B
M7.01 - EQUIPMENT CONTROL SCHEMATICS
M7.02 - AHU CONTROL SCHEMATICS
M7.03 - AHU CONTROL SCHEMATICS
M7.04 - BOILER CONTROL SCHEMATICS
E1.01 - ELECTRICAL SYMBOL LEGEND
E1.02 - ELECTRICAL DETAILS
E1.03 - SEQUENCE OF OPERATIONS
ED.01 - UNIT A - FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED.02 - UNIT B - FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED.03 - UNIT C - FIRST FLOOR ELECTRICAL DEMOLITON PLAN
ED.04 - UNIT D - FIRST FLOOR ELECTRICAL DEMOLITON PLAN
E.201 - ELECTRICAL SITE PLAN
E3.01 - UNIT A - FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN
E3.02 - UNIT B - FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN
E3.03 - UNIT C - FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN
E3.04 - UNIT D - FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN
E3.10 - UNIT B - SECOND FLOOR TECHNOLOGY ROUGH-IN PLAN
E3.17 - TECHNOLOGY ROUGH-IN DETAILS
E3.18 - TECHNOLOGY ROUGH-IN DETAILS
E4.01 - UNIT A - FIRST FLOOR LIGHTING PLAN
E4.02 - UNIT B - FIRST FLOOR LIGHTING PLAN
E4.03 - UNIT C - FIRST FLOOR LIGHTING PLAN
E4.04 - UNIT D - FIRST FLOOR LIGHTING PLAN
E5.01 - UNIT A - FIRST FLOOR POWER PLAN
E5.02 - UNIT B - FIRST FLOOR POWER PLAN
E5.03 - UNIT C - FIRST FLOOR POWER PLAN
E5.04 - UNIT D - FIRST FLOOR POWER PLAN
E5.05 - ELECTRICAL KITCHEN PLAN
E6.01 - UNIT A - FIRST FLOOR FIRE ALARM PLAN
E6.02 - UNIT B - FIRST FLOOR FIRE ALARM PLAN
E6.03 - UNIT C - FIRST FLOOR FIRE ALARM PLAN
E6.04 - UNIT D - FIRST FLOOR FIRE ALARM PLAN
E7.01 - ELECTRICAL ONE-LINE DIAGRAM
E8.01 - LUMINAIRE & PANELBOARD SCHEDULES
E8.02 - PANELBOARD SCHEDULES
CTE-E4.01 - UNIT A - FIRST FLOOR THEATRICAL LIGHTING PLAN
CTE-E4.02 - THEATRICAL LIGHTING DETAILS
TD1.01 - UNIT A - TECHNOLOGY DEMOLITION PLAN
TD1.02 - UNIT B - TECHNOLOGY DEMOLITION PLAN
TD1.03 - UNIT C - TECHNOLOGY DEMOLITION PLAN
TD1.04 - UNIT D - TECHNOLOGY DEMOLITION PLAN
T1.01 - TECHNOLOGY DETAILS
T1.02 - TECHNOLOGY DETAILS
T1.03 - TECHNOLOGY DETAILS
T1.04 - TECHNOLOGY DETAILS
T1.05 - TECHNOLOGY DETAILS
T1.06 - TECHNOLOGY DETAILS
T2.01 - TECHNOLOGY SITE PLAN
T3.01 - UNIT A - FIRST FLOOR TECHNOLOGY PLAN
T3.02 - UNIT B - FIRST FLOOR TECHNOLOGY PLAN
T3.03 - UNIT C - FIRST FLOOR TECHNOLOGY PLAN
T3.04 - UNIT D - FIRST FLOOR TECHNOLOGY PLAN
T3.10 - UNIT B - SECOND FLOOR TECHNOLOGY PLAN
T4.01 - OVERALL FIRST FLOOR TECHNOLOGY PLAN
T5.01 - ENLARGED TECHNOLOGY ROOMS
T7.01 - TECHNOLOGY DEVICE SCHEDULES
T7.02 - TECHNOLOGY DEVICE SCHEDULES