2026 - Zionsville Community Schools District Wide Improvements Multiple Buildings Across District
Choose Plan Sheet:
»
COVER - COVER SHEET
G-001 - ABBREVIATIONS & INDEX
ZH-S-001 - GENERAL NOTES
ZH-S-101 - UNIT A - FOUNDATION AND SLAB PLAN
ZH-S-201 - UNIT A - MEZZANINE LEVEL FRAMING PLAN
ZH-S-202 - UNIT A - PARTIAL ROOF FRAMING PLAN
ZH-S-301 - FOUNDATION AND SLAB DETAILS
ZH-S-302 - SECTONS AND DETAILS
ZH-S-401 - MASONRY DETAILS
ZH-S-402 - MASONRY DETAILS
ZH-S-403 - MASONRY LINTELS
ZH-S-501 - FRAMING DETAILS
ZH-AP101 - FIRST FLOOR CODE PLAN
ZH-AP102 - FIRST FLOOR EXITING PLAN
ZH-AD11A - FIRST FLOOR DEMOLITION PLAN - UNIT A
ZH-AD11B - FIRST FLOOR DEMOLITION PLAN - UNIT B
ZH-A-11A - FIRST FLOOR AND MEZZANINE ARCHITECTURAL PLANS - UNIT A
ZH-A-11B - FIRST FLOOR ARCHITECTURAL PLAN - UNIT B
ZH-AC11A - FIRST FLOOR REFLECTED CEILING PLAN - UNIT A
ZH-AC11B - FIRST FLOOR REFLECTED CEILING PLAN - UNIT B
ZH-AC12A - SECOND FLOOR REFLECTED CEILING PLAN - UNIT A
ZH-AC12B - SECOND FLOOR REFLECTED CEILING PLAN - UNIT B
ZH-AR101 - ROOF PLAN
ZH-A-301 - BUILDING SECTIONS
ZH-A-310 - WALL SECTIONS
ZH-A-401 - ENLARGED TOILET ROOM PLANS MOUNTING HEIGHTS
ZH-A-430 - VERTICAL CIRCULATION
ZH-A-501 - WALL TYPES
ZH-A-502 - DETAILS
ZH-A-520 - CEILING DETAILS
ZH-A-601 - DOOR AND FRAME SCHEDULE, DOOR TYPES AND FRAME ELEVATIONS
ZH-A-620 - FRAME DETAILS
ZH-AF11A - FIRST FLOOR FINISH PLAN - UNIT A
ZH-AF11B - FIRST FLOOR FINISH PLAN - UNIT B
ZH-AF12B - SECOND FLOOR FINISH PLAN - UNIT B
ZH-AF201 - INTERIOR ELEVATIONS
ZH-AF202 - INTERIOR ELEVATIONS
ZH-AF601 - LIST OF FINISHES AND DETAILS
ZH-AQ11A - FIRST FLOOR EQUIPMENT PLAN - UNIT A
ZH-AQ201 - CASEWORK ELEVATIONS
ZH-AQ501 - EQUIPMENT DETAILS
ZH-AQ601 - CASEWORK SCHEDULES AND EQUIPMENT LIST OF FINISHES
ZH-FP101 - FIRST FLOOR FIRE PROTECTION PLAN - UNIT A
ZH-P-001 - SYMBOLS & ABBREVIATIONS
ZH-PFD00 - FOUNDATION PLUMBING DEMOLITION PLAN - UNIT A
ZH-PLD01 - FIRST FLOOR PLUMBING DEMOLITION PLAN - UNIT A
ZH-PLDR - ROOF PLUMBING DEMOLITION PLAN
ZH-PF10A - FOUNDATION PLUMBING PLAN - UNIT A
ZH-PL11A - FIRST FLOOR PLUMBING PLAN - UNIT A
ZH-PLRA - ROOF PLUMBING PLAN
ZH-P4-01 - ENLARGED PLUMBING PLANS
ZH-P5-01 - PLUMBING SCHEDULES, DETAILS AND ISOMETRIC
ZH-M001 - SYMBOLS & ABBREVIATIONS
ZH-MD11A - FIRST FLOOR DEMOLITION PLAN - UNIT A
ZH-MD12A - SECOND FLOOR DEMOLITION PLAN - UNIT A
ZH-MV11A - FIRST FLOOR VENTILATION PLAN - UNIT A
ZH-MV12A - SECOND FLOOR VENTILATION PLAN - UNIT A
ZH-MP11A - FIRST FLOOR MECHANICAL PIPING AND CONTROLS PLAN - UNIT A
ZH-MP12A - SECOND FLOOR MECHANICAL PIPING AND CONTROLS PLAN - UNIT A
ZH-MR101 - MECHANICAL ROOF PLAN
ZH-M-301 - MECHANICAL SECTIONS
ZH-M-501 - MECHANICAL DETAILS
ZH-M-601 - MECHANICAL SCHEDULES
ZH-M-701 - TEMPERATURE CONTROLS SCHEMATICS
ZH-E-001 - ELECTRICAL SYMBOLS & ABBREVIATIONS
ZH-ED11A - FIRST FLOOR ELECTRICAL DEMO PLAN - UNIT A
ZH-ED11B - FIRST FLOOR ELECTRICAL DEMO PLAN - UNIT B
ZH-EL11A - FIRST FLOOR LIGHTING PLAN - UNIT A
ZH-EL11B - FIRST FLOOR LIGHTING PLAN - UNIT B
ZH-EP11A - FIRST FLOOR POWER PLAN - UNIT A
ZH-EF110 - FIRST FLOOR FIRE ALARM PLAN
ZH-ET11A - FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN - AUDITORIUM
ZH-ET12A - SECOND FLOOR TECHNOLOGY ROUGH-IN PLAN - AUDITORIUM
ZH-ET501 - TECHNOLOGY ROUGH-IN DETAILS - AUDITORIUM
ZH-E-401 - THEATRICAL LIGHTING PLANS - AUDITORIUM
ZH-E-402 - THEATRICAL RIGGING PLANS - AUDITORIUM
ZH-E-403 - THEATRICAL PLANS - PAC
ZH-E-501 - ELECTRICAL DETAILS
ZH-E-502 - THEATRICAL DETAILS
ZH-E-601 - SCHEDULES
ZH-T-001 - TECHNOLOGY SYMBOLS & ABBREVIATIONS
ZH-TD11A - FIRST FLOOR DEMOLITION PLAN - AUDITORIUM
ZH-TD12A - SECOND FLOOR DEMOLITION PLAN - AUDITORIUM
ZH-T11A - FIRST FLOOR TECHNOLOGY PLAN - AUDITORIUM
ZH-T12A - SECOND FLOOR TECHNOLOGY PLAN - AUDITORIUM
ZH-T501 - TECHNOLOGY DETAILS
ZH-T502 - TECHNOLOGY DETAILS
ZH-T601 - TECHNOLOGY DEVICE SCHEDULES
ZH-T602 - TECHNOLOGY DEVICE SCHEDULES
ZH-T701 - TECHNOLOGY RISER DIAGRAM
ZH-T1B - TECHNOLOGY PLAN - BASEBALL SOFTBALL AUDIO
ZH-T1P - TECHNOLOGY PLAN - POOL AUDIO
ZH-T1S - TECHNOLOGY PLAN - STADIUM AUDIO
ZH-T2S - TECHNOLOGY PLAN - STADIUM PRESSBOX AUDIO
ZW-G1.00 - SITE PAVING PLAN
ZW-G1.01 - SITE PAVING PLAN
ZW-G4.00 - SITE DETAILS
ZW-G4.01 - SITE DETAILS
ZW-A-101 - STAGE FINISH & EQUIPMENT PLAN
ZW-M001 - MECHANICAL SYMBOLS AND ABBREVIATIONS
ZW-M-401 - ENLARGED UNIT E MAIN MECHANICAL ROOM
ZW-M-402 - ENLARGED UNIT A MECHANICAL MEZZANINE
ZW-M-403 - ENLARGED UNIT C MECHANICAL MEZZANINE
ZW-M-404 - ENLARGED UNIT D MECHANICAL MEZZANINE
ZW-M-405 - ENLARGED UNIT F MECHANICAL MEZZANINE
ZW-M-601 - MECHANICAL EQUIPMENT SCHEDULES
ZW-M-602 - MECHANICAL EQUIPMENT SCHEDULES
ZW-M-603 - MECHANICAL EQUIPMENT SCHEDULES
ZW-M-604 - MECHANICAL EQUIPMENT SCHEDULES
ZW-M-605 - MECHANICAL EQUIPMENT SCHEDULES
ZW-M-701 - EQUIPMENT CONTROLS SCHEMATIC
ZW-M-702 - HEATING WATER AND CHILLER WATER PIPING SCHEMATICS
ZW-M-703 - BOILER CONTROL SCHEMATIC
ZW-M-704 - CHILLER CONTROL SCHEMATIC
ZW-M-705 - AHU CONTROL SCHEMATIC
ZW-M-706 - AHU CONTROL SCHEMATIC
ZW-MC11A - UNIT A FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11B - UNIT B FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11C - UNIT C FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11D - UNIT D FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11E - UNIT E FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11F - UNIT F FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC11G - UNIT G FIRST FLOOR TEMPERATURE CONTROL PLAN
ZW-MC12A - UNIT A SECOND FLOOR TEMPERATURE CONTROL PLAN
ZW-MC12B - UNIT B SECOND FLOOR TEMPERATURE CONTROL PLAN
ZW-MC12C - UNIT C SECOND FLOOR TEMPERATURE CONTROL PLAN
ZW-MC12D - UNIT D SECOND FLOOR TEMPERATURE CONTROL PLAN
ZW-E-001 - ELECTRICAL SYMBOLS & ABBREVIATIONS
ZW-ED110 - THEATRICAL DEMO PLAN
ZW-EL110 - LIGHTING PLAN
ZW-FA1 - FIRST FLOOR - OVERALL FIRE ALARM PLAN
ZW-FA2 - SECOND FLOOR - OVERALL FIRE ALARM PLAN
ZW-FA3 - MEZZANINE LEVEL FIRE ALARM PLAN
ZW-E-401 - THEATRICAL LIGHTING PLAN
ZW-E-501 - THEATRICAL DETAILS
ZW-E-601 - THEATRICAL SCHEDULES
ZW-T11A - FIRST FLOOR TECHNOLOGY PLAN - AUDITORIUM
ZM-A-101 - STAGE FINISH & EQUIPMENT PLAN
ZM-E-001 - ELECTRICAL SYMBOLS & ABBREVIATIONS
ZM-ED110 - THEATRICAL DEMO PLAN
ZM-EL110 - LIGHTING PLAN
ZM-E-401 - THEATRICAL LIGHTING PLAN
ZM-E-501 - THEATRICAL DETAILS
ZM-E-601 - THEATRICAL SCHEDULES
ZM-T11A - FIRST FLOOR TECHNOLOGY PLAN - AUDITORIUM
EEA-101 - OVERALL FIRST FLOOR PLAN AND CEILING PLAN
EEA-11A - DEMO PLAN AND FLOOR PLAN
EEA-201 - ELEVATIONS, SECTIONS, AND DETAILS
EEA-501 - COLUMN WRAP DETAILS
EEA-901 - 3D PERSPECTIVE VIEWS
BM-G1.00 - SITE PAVING PLAN BM-G1.00
BM-G1.01 - SITE PAVING PLAN
BM-G4.00 - SITE DETAILS
BM-FA1A - FIRST FLOOR FIRE ALARM PLAN - UNIT A
BM-FA1B - FIRST FLOOR FIRE ALARM PLAN - UNIT B
BM-FA1C - FIRST FLOOR FIRE ALARM PLAN - UNIT C
BM-FA1D - FIRST FLOOR FIRE ALARM PLAN - UNIT D
BM-FA2A - SECOND FLOOR FIRE ALARM PLAN - UNIT A
BM-FA2B - SECOND FLOOR FIRE ALARM PLAN - UNIT B
BM-FA2CD - SECOND FLOOR FIRE ALARM PLAN - UNIT C & D
BM-T11 - OVERALL FIRST FLOOR TECHNOLOGY PLAN
BM-T12 - OVERALL SECOND FLOOR TECHNOLOGY PLAN
SG-G0-01 - GENERAL NOTES
SG-G1 - SURVEY
SG-GD1-00 - EXISTING CONDITIONS DEMO PLAN
SG-G1-00 - PROPOSED SITE
PLAN -SG-G1-01 - PROPOSED SITE REPAIR AREA A
PLAN -SG-G1-02 - PROPOSED SITE REPAIR AREA B
PLAN -SG-G1-03 - PROPOSED SITE REPAIR AREA C
SG-G2-01 - GRADING & UTILITY PLAN AREA B
SG-G3-01 - EROSION CONTROL PLAN AREA A
SG-G3-02 - EROSION CONTROL PLAN AREA B
SG-G3-03 - EROSION CONTROL PLAN AREA C
SG-G3-04 - STORMWATER POLLUTION PLAN
SG-G4-00 - PROPOSED SITE DETAILS
SG-G4-01 - SITE DETAILS
SG-L1-01 - LANDSCAPE PLAN
SG-L2-01 - LANDSCAPE DETAILS
SG-E1-01 - ELECTRICAL SITE PLAN
SG-FA1A - FIRST FLOOR FIRE ALARM PLAN UNIT A
SG-FA1B - FIRST FLOOR FIRE ALARM PLAN UNIT B
SG-FA1C - FIRST FLOOR FIRE ALARM PLAN UNIT C
SG-FA1D - FIRST FLOOR FIRE ALARM PLAN UNIT D
SG-FA2A - SECOND FLOOR FIRE ALARM PLAN UNIT A AND UNIT C
SG-FA2B - SECOND FLOOR FIRE ALARM PLAN UNIT B AND UNIT D
SG-T11 - OVERALL FIRST FLOOR TECHNOLOGY PLAN
SG-T12 - OVERALL SECOND FLOOR TECHNOLOGY PLAN
UE-M001 - MECHANICAL SYMBOLS AND ABBREVIATIONS
UE-M-401 - UNIT A & B MEZZANINE TEMPERATURE CONTROL PLAN
UE-M-402 - UNIT C D & E MEZZANINE TEMPERATURE CONTROL PLAN
UE-M-601 - MECHANICAL EQUIPMENT SCHEDULES
UE-M-602 - MECHANICAL EQUIPMENT SCHEDULES
UE-M-603 - MECHANICAL EQUIPMENT SCHEDULES
UE-M-701 - EQUIPMENT CONTROLS SCHEMATICS
UE-M-702 - HOT & CHILLED WATER PLANT SCHEMATICS
UE-M-703 - AHU CONTROLS SCHEMATICS
UE-M-704 - BOILER CONTROL SCHEMATICS
UE-M-705 - CHILLER CONTROL SCHEMATICS
UE-MC11A - UNIT A-TEMPERATURE CONTROL PLAN
UE-MC11B - UNIT B-TEMPERATURE CONTROL PLAN
UE-MC11C - UNIT C-TEMPERATURE CONTROL PLAN
UE-MC11D - UNIT D-TEMPERATURE CONTROL PLAN
UE-MC11E - UNIT E-TEMPERATURE CONTROL PLAN
UE-FA1A - UNIT A - FIRST FLOOR FIRE ALARM PLAN
UE-FA1B - UNIT B - FIRST FLOOR FIRE ALARM PLAN
UE-FA1C - UNIT C - FIRST FLOOR FIRE ALARM PLAN
UE-FA1D - UNIT D - FIRST FLOOR FIRE ALARM PLAN
UE-FA1E - UNIT E - FIRST FLOOR FIRE ALARM PLAN
UE-FA2 - SECOND FLOOR FIRE ALARM PLANS
UE-T11 - OVERALL FIRST FLOOR PLAN
UE-T12 - OVERALL SECOND FLOOR PLAN