Skillman Plan Room
Public Projects
Private Projects
Addendum Watch
Bid Tab Watch
Sign In/Register
Edwardsburg Public Schools Middle School & High School Renovation
Information
Plan Holders
Plans
Shipping Information
Addenda
Bid Tab
Reference Items
Pre-Bid Information
Filter:
0010
G 001
COVER SHEET (1)
0010-G 001_COVER SHEET (1).pdf
0020
G 003
TYPICAL SYMBOLS AND ABBREVIATIONS, DEVICE (1)
0020-G 003_TYPICAL SYMBOLS AND ABBREVIATIONS, DEVICE (1).pdf
0030
G 101
OVERALL FIRST FLOOR CODE COMPLIANCE PLAN (1)
0030-G 101_OVERALL FIRST FLOOR CODE _COMPLIANCE PLAN (1).pdf
0040
S 001
STRUCTURAL NOTES (1)
0040-S 001_STRUCTURAL NOTES (1).pdf
0050
S 301
OVERALL ROOF FRAMING PLAN (1)
0050-S 301_OVERALL ROOF FRAMING PLAN (1).pdf
0060
S 301A
ROOF FRAMING PLAN - UNIT A (1)
0060-S 301A_ROOF FRAMING PLAN - UNIT A (1).pdf
0070
S 301D
ROOF FRAMING PLAN - UNIT D (1)
0070-S 301D_ROOF FRAMING PLAN - UNIT D (1).pdf
0080
S 401
FRAMING DETAILS (1)
0080-S 401_FRAMING DETAILS (1).pdf
0090-A~1.PDF
0100
AD 101
OVERALL FIRST FLOOR DEMOLITION PLAN (1)
0100-AD 101_OVERALL FIRST FLOOR DEMOLITION _PLAN (1).pdf
0110
AD 101A
FIRST FLOOR DEMOLITION PLAN A (1)
0110-AD 101A_FIRST FLOOR DEMOLITION PLAN A (1).pdf
0120
AD 101D
FIRST FLOOR DEMOLITION PLAN D (1)
0120-AD 101D_FIRST FLOOR DEMOLITION PLAN D (1).pdf
0130
AD 102
OVERALL ROOF DEMOLITION (1)
0130-AD 102_OVERALL ROOF DEMOLITION (1).pdf
0140
AD 301
EXTERIOR DEMOLITION ELEVATIONS (1)
0140-AD 301_EXTERIOR DEMOLITION ELEVATIONS (1).pdf
0150
A 101
OVERALL FIRST FLOOR PLAN (1)
0150-A 101_OVERALL FIRST FLOOR PLAN (1).pdf
0160
A 101A
FIRST FLOOR PLAN - UNIT A (1)
0160-A 101A_FIRST FLOOR PLAN - UNIT A (1).pdf
0170
A 101D
FIRST FLOOR PLAN - UNIT D (1)
0170-A 101D_FIRST FLOOR PLAN - UNIT D (1).pdf
0180
A 102
OVERALL ROOF PLAN (1)
0180-A 102_OVERALL ROOF PLAN (1).pdf
0190
A 103
ROOF DETAILS (1)
0190-A 103_ROOF DETAILS (1).pdf
0200
A 201
OVERALL FIRST FLOOR REFLECTED CEILING PLAN (1)
0200-A 201_OVERALL FIRST FLOOR REFLECTED _CEILING PLAN (1).pdf
0210
A 201A
FIRST FLOOR REFLECTED CEILING PLAN - UNIT A (1)
0210-A 201A_FIRST FLOOR REFLECTED CEILING _PLAN - UNIT A (1).pdf
0220
A 201D
FIRST FLOOR REFLECTED CEILING PLAN - UNIT D (1)
0220-A 201D_FIRST FLOOR REFLECTED CEILING _PLAN - UNIT D (1).pdf
0230
A 301
EXTERIOR ELEVATIONS (1)
0230-A 301_EXTERIOR ELEVATIONS (1).pdf
0240
A 311
BUILDING SECTIONS (1)
0240-A 311_BUILDING SECTIONS (1).pdf
0250
A 321
WALL SECTIONS AND DETAILS (1)
0250-A 321_WALL SECTIONS AND DETAILS (1).pdf
0260-A~1.PDF
0270
A 501
DOOR SCHEDULES (1)
0270-A 501_DOOR SCHEDULES (1).pdf
0280
IG 001
TYPICAL SYMBOLS & GENERAL (1)
0280-IG 001_TYPICAL SYMBOLS & GENERAL (1).pdf
0290
IG 002
MATERIAL SELECTION SCHEDULE (1)
0290-IG 002_MATERIAL SELECTION SCHEDULE (1).pdf
0300
I 101A
FIRST FLOOR FINISH PLAN - UNIT (1)
0300-I 101A_FIRST FLOOR FINISH PLAN - UNIT (1).pdf
0310
I 101D
FIRST FLOOR FINISH PLAN - UNIT (1)
0310-I 101D_FIRST FLOOR FINISH PLAN - UNIT (1).pdf
0320
I 301
INTERIOR ELEVATIONS (1)
0320-I 301_INTERIOR ELEVATIONS (1).pdf
0330
I 401
ENLARGED TOILET FINISH PLANS DETAILS (1)
0330-I 401_ENLARGED TOILET FINISH PLANS DETAILS (1).pdf
0340
I 501
ENLARGED MILLWORK FINISH AND DETAILS (1)
0340-I 501_ENLARGED MILLWORK FINISH AND DETAILS (1).pdf
0350
I 502
ENLARGED MILLWORK FINISH AND DETAILS (1)
0350-I 502_ENLARGED MILLWORK FINISH AND DETAILS (1).pdf
0360
P 000
PLUMBING GENERAL INFORMATION (1)
0360-P 000_PLUMBING GENERAL INFORMATION (1).pdf
0370
PD 101
OVERALL PLUMBING DEMOLITION (1)
0370-PD 101_OVERALL PLUMBING DEMOLITION (1).pdf
0380
PD 301
ENLARGED PLUMBING DEMOLITION PLAN (1)
0380-PD 301_ENLARGED PLUMBING DEMOLITION _PLAN (1).pdf
0390
P 101
FIRST FLOOR OVERALL PLUMBING (1)
0390-P 101_FIRST FLOOR OVERALL PLUMBING (1).pdf
0400
P 301
ENLARGED PLUMBING PLAN (1)
0400-P 301_ENLARGED PLUMBING PLAN (1).pdf
0410
H 000
HVAC GENERAL INFORMATION (1)
0410-H 000_HVAC GENERAL INFORMATION (1).pdf
0420
HD 001
OVERALLFIRST FLOOR HVAC DEMOLITION PLAN (1)
0420-HD 001_OVERALLFIRST FLOOR HVAC _DEMOLITION PLAN (1).pdf
0430
H 101
OVERALL FIRST FLOOR HVAC (1)
0430-H 101_OVERALL FIRST FLOOR HVAC (1).pdf
0440
H 301
ENLARGED HVAC PLANS (1)
0440-H 301_ENLARGED HVAC PLANS (1).pdf
0450
H 501
HVAC DETAILS (1)
0450-H 501_HVAC DETAILS (1).pdf
0460
E 100
ELECTRICAL SYMBOL FIXTURE (1)
0460-E 100_ELECTRICAL SYMBOL_FIXTURE (1).pdf
0470
E 101
ELECTRICAL ONE-LINE DIAGRAMS (1)
0470-E 101_ELECTRICAL ONE-LINE DIAGRAMS (1).pdf
0480
ED 001A
FIRST FLOOR ELECTRICAL PLAN - UNIT A (1)
0480-ED 001A_FIRST FLOOR ELECTRICAL PLAN - UNIT A (1).pdf
0490
ED 001D
FIRST FLOOR ELECTRICAL PLAN - UNIT D (1)
0490-ED 001D_FIRST FLOOR ELECTRICAL PLAN - UNIT D (1).pdf
0500
E 201A
FIRST FLOOR LIGHTING PLAN - (1)
0500-E 201A_FIRST FLOOR LIGHTING PLAN - (1).pdf
0510
E 201D
FIRST FLOOR LIGHTING PLAN - (1)
0510-E 201D_FIRST FLOOR LIGHTING PLAN - (1).pdf
0520
E 301
OVERALL FIRST FLOOR ELECTRICAL PLAN (1)
0520-E 301_OVERALL FIRST FLOOR ELECTRICAL _PLAN (1).pdf
0530
E 301A
FIRST FLOOR POWER AND PLAN - UNIT A (1)
0530-E 301A_FIRST FLOOR POWER AND PLAN - UNIT A (1).pdf
0540
E 301D
FIRST FLOOR POWER AND PLAN - UNIT D (1)
0540-E 301D_FIRST FLOOR POWER AND PLAN - UNIT D (1).pdf
0550
TG001
TECHNOLOGY SYMBOLS AND NOTES (1)
0550-TG001_TECHNOLOGY SYMBOLS AND NOTES (1).pdf
0560
TD101A
FIRST FLOOR TECHNOLOGY DEMOLITION PLAN - UNIT A (1)
0560-TD101A_FIRST FLOOR TECHNOLOGY _DEMOLITION PLAN - UNIT A (1).pdf
0570
TD101D
FIRST FLOOR TECHNOLOGY DEMOLITION PLAN - UNIT d (1)
0570-TD101D_FIRST FLOOR TECHNOLOGY _DEMOLITION PLAN - UNIT d (1).pdf
0580
T101A
FIRST FLOOR TECHNOLOGY UNIT A (1)
0580-T101A_FIRST FLOOR TECHNOLOGY UNIT A (1).pdf
0590
T101D
FIRST FLOOR TECHNOLOGY UNIT D (1)
0590-T101D_FIRST FLOOR TECHNOLOGY UNIT D (1).pdf
0600
T 401
TECHNOLOGY DETAILS (1)
0600-T 401_TECHNOLOGY DETAILS (1).pdf
0610
T 421
AV DETAILS (1)
0610-T 421_AV DETAILS (1).pdf
0620
T 422
AV1 DETAILS (1)
0620-T 422_AV1 DETAILS (1).pdf
0630
T 442
ACCES CONTROL DETAILS (1)
0630-T 442_ACCES CONTROL DETAILS (1).pdf
0640
T 443
ACCESS CONTROLLED DOOR ELEVATIONS (1)
0640-T 443_ACCESS CONTROLLED DOOR _ELEVATIONS (1).pdf
0650
T 444
ACCESS CONTROLLED DOOR ELEVATIONS (1)
0650-T 444_ACCESS CONTROLLED DOOR _ELEVATIONS (1).pdf
0660
G 001
COVER SHEET
0660-G 001_COVER SHEET.pdf
0670
G 002
TYPICAL SYMBOLS AND ABBREVIATIONS, DEVICE
0670-G 002_TYPICAL SYMBOLS AND ABBREVIATIONS, DEVICE.pdf
0680
G 101
FIRST FLOOR CODE COMPLIANCE
0680-G 101_FIRST FLOOR CODE COMPLIANCE.pdf
0690
S 001
STRUCTURAL NOTES
0690-S 001_STRUCTURAL NOTES.pdf
0700
S 101C
FOUNDATION PLAN - UNIT C
0700-S 101C_FOUNDATION PLAN - UNIT C.pdf
0710
S 301
OVERALL ROOF FRAMING PLAN
0710-S 301_OVERALL ROOF FRAMING PLAN.pdf
0720
S 301B
ROOF FRAMING PLAN - UNIT B
0720-S 301B_ROOF FRAMING PLAN - UNIT B.pdf
0730
S 301C
ROOF FRAMING PLAN - UNIT C
0730-S 301C_ROOF FRAMING PLAN - UNIT C.pdf
0740
S 401
FRAMING DETAILS
0740-S 401_FRAMING DETAILS.pdf
0750-A~1.PDF
0760
AD 101
OVERALL FIRST FLOOR DEMOLITION PLAN
0760-AD 101_OVERALL FIRST FLOOR DEMOLITION _PLAN.pdf
0770
AD 101C
FIRST FLOOR DEMOLITION PLAN C
0770-AD 101C_FIRST FLOOR DEMOLITION PLAN C.pdf
0780
AD 102
OVERALL ROOF DEMOLITION
0780-AD 102_OVERALL ROOF DEMOLITION.pdf
0790
AD 102B
ROOF DEMOLITION PLAN - UNIT
0790-AD 102B_ROOF DEMOLITION PLAN - UNIT.pdf
0800
AD 102C
ROOF DEMOLITION PLAN - UNIT
0800-AD 102C_ROOF DEMOLITION PLAN - UNIT.pdf
0810
AD 102D
ROOF DEMOLITION PLAN - UNIT
0810-AD 102D_ROOF DEMOLITION PLAN - UNIT.pdf
0820
A 101
OVERALL FIRST FLOOR PLAN
0820-A 101_OVERALL FIRST FLOOR PLAN.pdf
0830
A 101C
FIRST FLOOR PLAN - UNIT C
0830-A 101C_FIRST FLOOR PLAN - UNIT C.pdf
0840
A 102
OVERALL ROOF PLAN
0840-A 102_OVERALL ROOF PLAN.pdf
0850
A 102B
ROOF PLAN - UNIT B
0850-A 102B_ROOF PLAN - UNIT B.pdf
0860
A 102C
ROOF PLAN - UNIT C
0860-A 102C_ROOF PLAN - UNIT C.pdf
0870
A 102D
ROOF PLAN - UNIT D
0870-A 102D_ROOF PLAN - UNIT D.pdf
0880
A 103
ROOF PLAN DETAILS
0880-A 103_ROOF PLAN DETAILS.pdf
0890
A 201
OVERALL FIRST FLOOR REFLECTED CEILING PLAN
0890-A 201_OVERALL FIRST FLOOR REFLECTED _CEILING PLAN.pdf
0900
A 201C
FIRST FLOOR REFLECTED CEILING PLAN - UNIT C
0900-A 201C_FIRST FLOOR REFLECTED CEILING _PLAN - UNIT C.pdf
0910-A~1.PDF
0920
A 501
DOOR SCHEDULES
0920-A 501_DOOR SCHEDULES.pdf
0930
IG 001
TYPICAL SYMBOLS & GENERAL
0930-IG 001_TYPICAL SYMBOLS & GENERAL.pdf
0940
IG 002
MATERIAL SELECTION SCHEDULE, TYPICAL DETAILS, AND INTERIOR ELEVATIONS
0940-IG 002_MATERIAL SELECTION SCHEDULE, _TYPICAL DETAILS, AND INTERIOR _ELEVATIONS.pdf
0950
I 101C
FIRST FLOOR FINISH PLAN -
0950-I 101C_FIRST FLOOR FINISH PLAN -.pdf
0960
I 401
ENLARGED TOILET FINISH PLANS DETAILS
0960-I 401_ENLARGED TOILET FINISH PLANS DETAILS.pdf
0970
I 501
ENLARGED MILLWORK FINISH AND DETAILS
0970-I 501_ENLARGED MILLWORK FINISH AND DETAILS.pdf
0980
P 000
PLUMBING GENERAL INFORMATION
0980-P 000_PLUMBING GENERAL INFORMATION.pdf
0990
PD 101
OVERALL FIRST FLOOR PLUMBING DEMOLITION PLAN
0990-PD 101_OVERALL FIRST FLOOR PLUMBING _DEMOLITION PLAN.pdf
1000
PD 301
ENLARGED PLUMBING DEMOLITION PLAN
1000-PD 301_ENLARGED PLUMBING DEMOLITION _PLAN.pdf
1010
P 101
OVERALL FIRST FLOOR PLUMBING
1010-P 101_OVERALL FIRST FLOOR PLUMBING.pdf
1020
P 301
ENLARGED PLUMBING PLAN
1020-P 301_ENLARGED PLUMBING PLAN.pdf
1030
H 000
HVAC GENERAL INFORMATION
1030-H 000_HVAC GENERAL INFORMATION.pdf
1040
HD 001
OVERALL FIRST FLOOR HVAC DEMOLITION PLAN
1040-HD 001_OVERALL FIRST FLOOR HVAC _DEMOLITION PLAN.pdf
1050
H 102
ROOF HVAC PLAN
1050-H 102_ROOF HVAC PLAN.pdf
1060
H 301
ENLARGED HVAC PLANS
1060-H 301_ENLARGED HVAC PLANS.pdf
1070
E 100
ELECTRICAL SYMBOL FIXTURE
1070-E 100_ELECTRICAL SYMBOL_FIXTURE.pdf
1080
ED 001C
FIRST FLOOR ELECTRICAL PLAN - UNIT C
1080-ED 001C_FIRST FLOOR ELECTRICAL PLAN - UNIT C.pdf
1090
E 201C
FIRST FLOOR LIGHTING PLAN -
1090-E 201C_FIRST FLOOR LIGHTING PLAN -.pdf
1100
E 301
OVERALL FIRST FLOOR ELECTRICAL PLAN
1100-E 301_OVERALL FIRST FLOOR ELECTRICAL _PLAN.pdf
1110
E 301C
FIRST FLOOR POWER AND PLAN - UNIT C
1110-E 301C_FIRST FLOOR POWER AND PLAN - UNIT C.pdf
1120
TG001
TECHNOLOGY SYMBOLS AND NOTES
1120-TG001_TECHNOLOGY SYMBOLS AND NOTES.pdf
1130
TD101C
FIRST FLOOR TECHNOLOGY DEMOLITION PLAN - UNIT C
1130-TD101C_FIRST FLOOR TECHNOLOGY _DEMOLITION PLAN - UNIT C.pdf
1140
T101C
FIRST FLOOR TECHNOLOGY UNIT C
1140-T101C_FIRST FLOOR TECHNOLOGY UNIT C.pdf
1150
T 401
TECHNOLOGY DETAILS
1150-T 401_TECHNOLOGY DETAILS.pdf
1160
T 421
AV DETAILS
1160-T 421_AV DETAILS.pdf
1170
T 441
CAMERA DETAILS
1170-T 441_CAMERA DETAILS.pdf
1180
T 442
ACCES CONTROL DETAILS
1180-T 442_ACCES CONTROL DETAILS.pdf
1190
T 443
ACCESS CONTROLLED DOOR ELEVATIONS
1190-T 443_ACCESS CONTROLLED DOOR _ELEVATIONS.pdf
1200
T 444
ACCESS CONTROLLED DOOR ELEVATIONS
1200-T 444_ACCESS CONTROLLED DOOR _ELEVATIONS.pdf
If you need assistance with the plan room please contact
Eastern Engineering here
or call Eastern Engineering Fishers at
(317) 598-0661
.
© Copyright Eastern Engineering 2001-2024