Skillman Plan Room
Public Projects
Private Projects
Addendum Watch
Bid Tab Watch
Sign In/Register
Hamilton Southeastern High School Bus Lot Improvements Phase A
Information
Plan Holders
Plans
Shipping Information
Addenda
Bid Tab
Reference Items
Pre-Bid Information
Filter:
0010
C001
TITLE SHEET
0010-C001_TITLE SHEET.pdf
0020
C002
GENERAL NOTES
0020-C002_GENERAL NOTES.pdf
0030
C003
SPECIFICATIONS
0030-C003_SPECIFICATIONS.pdf
0040
C100
EXISTING
0040-C100_EXISTING.pdf
0050
C110
DEMOLITION PLAN
0050-C110_DEMOLITION PLAN.pdf
0060
C200
SITE ENTRANCE
0060-C200_SITE ENTRANCE.pdf
0070
C300
GRADING PLAN
0070-C300_GRADING PLAN.pdf
0080
C301
GRADING PLAN
0080-C301_GRADING PLAN.pdf
0090
C350
EMERGENCY FLOOD
0090-C350_EMERGENCY FLOOD.pdf
0100
C400
UTILITY PLAN
0100-C400_UTILITY PLAN.pdf
0110
C410
STORM SEWER PLAN
0110-C410_STORM SEWER PLAN.pdf
0120
C415
STORM STRUCTURE
0120-C415_STORM STRUCTURE.pdf
0130
C500
INITIAL EROSION
0130-C500_INITIAL EROSION.pdf
0140
C501
EROSION CONTROL
0140-C501_EROSION CONTROL.pdf
0150
C502
FINAL EROSION
0150-C502_FINAL EROSION.pdf
0160
C510
STORM WATER
0160-C510_STORM WATER.pdf
0170
C520
EROSION CONTROL
0170-C520_EROSION CONTROL.pdf
0180
C521
EROSION CONTROL
0180-C521_EROSION CONTROL.pdf
0190
C600
SITE DETAILS
0190-C600_SITE DETAILS.pdf
0200
1 of 29
TITLE SHEET
0200-1 of 29_TITLE SHEET.pdf
0210
2 of 29
ARTERIAL AND COLLECTOR TYPICAL PAVEMENT AND ROADWAY SECTION
0210-2 of 29_ARTERIAL AND COLLECTOR TYPICAL PAVEMENT AND ROADWAY SECTION.pdf
0220
3 of 29
LOCAL STREET TYPICAL PAVEMENT AND ROADWAY SECTIONS
0220-3 of 29_LOCAL STREET TYPICAL PAVEMENT AND ROADWAY SECTIONS.pdf
0230
4 of 29
CURB AND UNDERDRAIN DETAILS
0230-4 of 29_CURB AND UNDERDRAIN DETAILS.pdf
0240
5 of 29
DRIVEWAY CUL-DE-SAC-AND MISC TRANSPORTATION DETAILS
0240-5 of 29_DRIVEWAY CUL-DE-SAC-AND MISC TRANSPORTATION DETAILS.pdf
0250
6 of 29
SIDEWALK CURB RAMP AND PERIMETER PATH DETAILS
0250-6 of 29_SIDEWALK CURB RAMP AND PERIMETER PATH DETAILS.pdf
0260
13 of 29
STORM SEWER BACKFILL SWALE UNDERDRAIN EXCAVATION DETAILS AND NOTES
0260-13 of 29_STORM SEWER BACKFILL SWALE UNDERDRAIN EXCAVATION DETAILS AND NOTES.pdf
0270
14 of 29
STORM SEWER INLET STRUCTURE DETAILS AND NOTES
0270-14 of 29_STORM SEWER INLET STRUCTURE DETAILS AND NOTES.pdf
0280
15 of 29
STORM SEWER MANHOLE STRUCTURE DETAILS AND NOTES
0280-15 of 29_STORM SEWER MANHOLE STRUCTURE DETAILS AND NOTES.pdf
0290
24 of 29
EROSION CONTROL DETAILS
0290-24 of 29_EROSION CONTROL DETAILS.pdf
0300
25 of 29
EROSION CONTROL DETAILS
0300-25 of 29_EROSION CONTROL DETAILS.pdf
0310
27 of 29
EROSION CONTROL DETAILS
0310-27 of 29_EROSION CONTROL DETAILS.pdf
0320
L001
TREE PRESERVATION PLAN
0320-L001_TREE PRESERVATION PLAN.pdf
0330
L101
MATERIALS & NOTES PLAN
0330-L101_MATERIALS & NOTES PLAN.pdf
0340
L102
MATERIALS & NOTES PLAN
0340-L102_MATERIALS & NOTES PLAN.pdf
0350
L201
LAYOUT PLAN
0350-L201_LAYOUT PLAN.pdf
0360
L401
PLANTING PLAN
0360-L401_PLANTING PLAN.pdf
0370
L410
PLANTING DETAILS
0370-L410_PLANTING DETAILS.pdf
0380
L501
SITE DETAILS
0380-L501_SITE DETAILS.pdf
0390
L502
SITE DETAILS
0390-L502_SITE DETAILS.pdf
If you need assistance with the plan room please contact
Eastern Engineering here
or call Eastern Engineering Fishers at
(317) 598-0661
.
© Copyright Eastern Engineering 2001-2024